CHATSWORTH: Way out in the West Valley, work progresses on the Orange Line busway extension. Metro provided the above photo, which shows construction of a bridge being built over railroad tracks near Lassen Street in Chatsworth. Metro says the busway--connecting the current Orange Line terminus in Warner Center with the Chatsworth Metrolink station, and adding four new stations along the right-of-way--is still planned for a mid-2012 completion. [Curbed Staff]
Filed under:
Latest Photo of Orange Line's Bridge to Chatsworth
Share this story
The Latest
Curbed LA Is Closing
Head to Curbed.com — soon to be a part of the New York Magazine family — for more of the Curbed LA that you know and love.
Koreatown Craftsman With Lots of Hand-Carved Woodwork Asks $1.5M
Built in 1910, the house sits on a lush property that includes a recording studio out back.
Loading comments...