"The initial phase of the project will cost $4.2 billion and consist two lines covering about 44 miles of track. The first line, the Red Line, will open in September 2009..." Yeah. That's a story about the "horrific traffic congestion" in Dubai and their planned subway. It should be done by 2020. [Wired]
Share this story
The Latest
Curbed LA Is Closing
Head to Curbed.com — soon to be a part of the New York Magazine family — for more of the Curbed LA that you know and love.
Koreatown Craftsman With Lots of Hand-Carved Woodwork Asks $1.5M
Built in 1910, the house sits on a lush property that includes a recording studio out back.
Loading comments...